MAPEFLEX PU21

Two-component, high-strength, castable epoxy-polyurethane sealant for movements up to 5%.
TECHNICAL DATA:
Movement in service: 5%.
Shore A hardness: 65.
Workability time: 45 minutes.
Set to light foot traffic: 24-36 hours.
Colour: 113 grey.
Application: by pouring.
Consumption: 0.15 kg/m (10x10 mm section).
Packaging: 5 kg drums (A+B).

İlgili belgeler

Teknik veri sayfası
İndir

Son Projeler MAPEFLEX PU21

Category icon TİCARİ TESİSLER

2018

Central i-City Mall

Shah Alam, Malaysia

Floor/wall coverıng, Installatıon of floor and wall coverıngs

Category icon ÜRETİM TESİSLERİ

2010

Cheese factory Sarmich

Sarmich, Mordoviya, Russian

Concrete restoratıon, Installatıon of floors, Surface preparatıon, Waterproofıng

Category icon ÜRETİM TESİSLERİ

2017/2018

Former plant Sacramora

VIserba di RImini, Italy

Sealants applıcatıon

Category icon TİCARİ TESİSLER

2015/2017

Plaza Arkadia

Malaysia

Installatıon of floor and wall coverıngs

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun