Yarda | Wanchai |
---|---|
Ubicación | Hong Kong |
Subcategoría | TUNNEL |
Aplicación | Waterproofing (8,000 m2) |
Fecha de inicio y finalización | 2014/2016 |
Tipo de aplicación | Construcción subterránea |
Propietario | Civil Engineering & Development Department, HKSAR |
Empresa contratista | Chun Wo - Leader Joint Venture |
Empresas instaladoras | Hop Shing Waterproof Construction Co. Ltd. |
Arquitectos | AECOM Asia Co. Ltd. |
Distribuidor de MAPEI | Mapei China Ltd. |
Descripción | Along the coastline at Wan Chai North and North Point, the cut and cover tunnel was built and it needs a high-performance waterproofing system to ensure a safe and efficient transport facilities to public. Purtop 400M HK was proposed to protect the 8,000 sq.m tunnel from any leakages. |