Yarda | Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities |
---|---|
Ubicación | Hong Kong |
Subcategoría | TUNNEL |
Aplicación | Waterproofing (Mapeplan TUS - 80,000 m2 & Purtop - 83,000 m2) |
Fecha de inicio y finalización | 2015/2017 |
Tipo de aplicación | Construcción subterránea |
Propietario | Hong Kong SAR Government - Highway Dept. |
Empresa contratista | China State Construction Engineering (Hong Kong) Limited |
Empresas instaladoras | Hopshing Waterproof Construction Co. Ltd. |
Distribuidor de MAPEI | Mapei China Ltd. |
Descripción | Scenic Hill Tunnel is a part of Tuen Mun Check Lap Kok Link construction, which included a 1 km dual-3 lane drill and blast tunnel and 1.6 km cut and cover tunnel. Contractor looked for a reliable waterproofing system to prevent from any risk of water leakage which is the reason why Purptop 400M HK was chosen. |