Wind Generation Electricity Projects

Location icon Central Texas, USA
N.º de ref.: 9999014
Categoría: INSTALACIONES DE PRODUCCION

Construcción

Yarda Wind Generation Electricity Projects
Ubicación Central Texas, USA
Subcategoría Power Plant
Aplicación Wind Generation Electricity Projects
Tipo de aplicación Aditivos para concreto, Nuevo edificio
Propietario Florida Power and Light
Empresa contratista D.H. Blattner and Sons
Descripción Ready Mix Supplier: Bauerly Brothers/Concrete Mobility Total Cubic Yards: 120,000 The concrete for the tower bases had a strength requirement of 5,000 to 6,000 psi in 28 days. High slump, high strength concrete was needed to place and consolidate the concrete with the large amount of steel reinforcement . The concrete also required extended slump life for the long haul to the project. The schedule dictated 1,500 – 2,000 cubic yards of concrete to be placed each day. This project was located in a remote region of central Texas which made delivery of materials a challenge. GRT dedicated two admixture trailers with full dispensing systems to service this project.

Producto usado en el proyecto

Mapeplast 400 NC
Mapeplast 400 NC
Aditivo reductor de agua Mapeplast 400 NC (antes conocido como Polychem 400…

Keep in touch