Yard | interior facilities installation with intense walking load |
---|---|
Location | Moscow, Russia |
Subcategory | SHOPPING CENTER |
Built in | 2012 |
Opened in | 2014 |
Application | floor and wall covering, joint grout, surface preparation |
Start and finish date | 2014 |
Application Type | Floor/wall coverings, Sealants application, Surface preparation |
Client | CJSC Aviapark |
Contractor company | Renaissance construction |
Architects | Callison |