PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Related documentation

Technical data sheet
Download

Last Projects PRIMER SN

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2019

Milan Linate Airport

Milan, Italy

Installation of floor and wall coverings, Sealants application

Category icon PRODUCTION FACILITIES

2012/2017

Data Center @ Tagore Lane

Singapore

Resin floors application

Category icon COMMERCIAL FACILITIES

2019

Chipmunks Pakuranga - Children's Play Centre

New Zealand

Installation of floors, Resin floors application

Category icon COMMERCIAL FACILITIES

2019

Durst Phototechnik

Bressanone, Italy

Resin floors application, Installation of floors

Keep in touch

Subscribe to our newsletter to get Mapei news