 Miami, USA
                                
                                    Miami, USA
                                
                             
                            | Yard | 247 meters link bridge | 
|---|---|
| Location | Miami, USA | 
| Subcategory | BRIDGE | 
| Built in | 1947 | 
| Opened in | 1947 | 
| Application | supply of products for concrete pillars and road repair | 
| Start and finish date | 2010/2011 | 
| Application Type | Concrete restoration systems | 
| Client | City of Miami | 
| Contractor company | Fibrwrap Construction | 
| Installer companies | Fibrwrap Construction | 
| Architects | Engineer - Metric Engineering | 
| MAPEI Distributor | Construction Materials, White Cap, E&E Construction Supply | 
| Credits | Raul Ballester and Autumn Nelson | 
| Project Manager | Jason Alexander | 
| MAPEI Coordination | Steve Bradway, Mapei Corp. (USA) | 
Here you can download all documents related to this project
 
                                 
                                 
                                 
                                 
                                 
                                    