PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.25-0.70 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B).

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download

Last Projects PRIMER SN

Category icon COMMERCIAL FACILITIES

2019

Urban Dogs

New Zealand

Resin floors application

Category icon SPORT FACILITIES

2017/2018

Szilárd Kiss Sports Hall

Siófok, Hungary

Installation of floors

Category icon COMMERCIAL FACILITIES

2020

UBER office Lithuania

Vilnius, Lithuania, Norway

Installation of floors, Resin floors application

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2020

Saint Antonius Girls' College

Yau Tong, Lam Tin, Hong Kong

Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news