Al Habtoor City (al Habtoor palace)

Location icon Dubai, United Arab Emirates
Ref #: 5829
Category: COMMERCIAL FACILITIES

Construction

Yard st. Regis, Westin & W Hotel
Location Dubai, United Arab Emirates
Subcategory HOTEL/INN
Built in 2013
Opened in 2016
Application supply of products for waterproofing, ceramic and stone installation
Start and finish date 2013/2016
Application Type New building
Client Al Habtoor Group LLC
Installer companies HLG Contracting; AHK International, Al Shirawi (impermeabilizzazione) Marmi Group, Dar Al Rokham (posa marmo), GCS (massetti)
Architects Khalib & Alami Consolidated Engineering Company
Designers (for works) Khalib & Alami Consolidated Engineering Company
MAPEI Coordination Bachir A Abdallah, Shatha Weldali, Hany Al Assal, Ian Gregory (Mapei Construction Chemicals LLC)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

ADESILEX P9

ADESILEX P9

High performance cementitious adhesive with no vertical slip and extended…
Ceramic
Internal
New Construction : No
KERACOLOR FF

KERACOLOR FF

High performance cementitious grout, polymer modified, water-repellent…
Internal
New Construction : No
KERAFLEX

KERAFLEX

High performance cementitious adhesive, with no vertical slip and extended…
Ceramic
Internal
New Construction : No
KERAFLEX MAXI S1

KERAFLEX MAXI S1

High performance, deformable cementitious adhesive with no vertical slip…
Stone
Internal
New Construction : No
MAPELASTIC SMART

MAPELASTIC SMART

Two-component, high-flexibility cementitious mortar (with crack-bridging …
Internal
New Construction : No
MAPETEX SEL

MAPETEX SEL

Non-woven, macro-holed polypropylene fabric for reinforcing waterproofing…
Internal
New Construction : No
PLANICRETE

PLANICRETE

Synthetic-rubber latex for cementitious mixes. Applications: Admixture to…
Internal
New Construction : No
PRIMER G

PRIMER G

Synthetic resin based primer in water dispersion. Applications: Treating…
Internal
New Construction : No
TOPCEM

TOPCEM

Special fast setting hydraulic binder for the preparation of normal…
Internal
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news