Waitaki Aquatic Centre

Location icon Nový Zéland
The aquatic centre had concrete decking around the pools that was slippery and absorbent and tracksite in the changing rooms that was delaminating. All mapei flooring product was mixed according to the technical date sheets. Tracksite antislip flooring was ground off existing concrete decking all decking was ground clean and vacuumed. Planiseal MR rolled out using 270mm/20mm nap roller sleeves. Quartz sand was broadcast into primer then left to cure. After curing excess sand was brushed, vacuumed then given a final brush. Mapefloor 300I was mixed and rolled out over sand with 270mm/10mm nap roller sleeves. Mapefloor finish 57 was applied within 24 hours on Mapefloor 300I with 270mm/7mm nap roller sleeves. All rolled coats where back rolled to achieve consistent application.

Stavba

Výrobek použitý v projektu

GRANIRAPID
GRANIRAPID
Dvousložkové cementové deformovatelné rychle tvrdnoucí lepidlo s velmi dobrými…
KERAPOXY
KERAPOXY
Dvousložková epoxidová vysoce kvalitní kyselinovzdorná spárovací hmota a…
MAPECEM
MAPECEM
Speciální hydraulické pojivo pro provádění potěrů s extrémně rychlým úbytkem…
MAPEFLEX MS45
MAPEFLEX MS45
Hybridní těsnicí tmel a lepidlo. ISO 11600 F 20 HM TECHNICKÉ ÚDAJE: Provozní…
MAPEFLOOR I 300 SL
MAPEFLOOR I 300 SL
Dvousložková epoxidová hmota neutrální barvy pro všestranné použití při…
MAPEFLOOR FINISH 57
MAPEFLOOR FINISH 57
Product not avalaible for this market,
contact us
PLANISEAL MR
PLANISEAL MR
Product not avalaible for this market,
contact us

Zůstaňte ve spojení

Přihlaste se k odběru newsletterů