Marriott Hotel, Mayfair

Location icon London, United Kingdom
Ref #: 7
Category: PUBLIC BUILDINGS AND URBAN DESIGN

Construction

Yard hall and bathrooms
Location London, United Kingdom
Subcategory HOTEL/INN
Opened in 2014
Application waterproofing and marble installation
Application Type Installation of floor and wall coverings
Client Marriott Hotel
Contractor company Superior Stone Ltd.
Other A complete Mapei system has been installed at the Marriott Hotel in London’s renowned Park Lane.

With a combination of traditional luxury and contemporary modern feel, the 5-star hotel renovation was implemented.

The hotel features an elegant and refurbished lobby area, as well as a newly redesigned meeting space. Mapei products were specified throughout the interior from public areas, guest rooms and bathrooms

Product used for the project

KERAQUICK S1

KERAQUICK S1

High-performance, quick-setting, deformable cementitious adhesive with no...
New Construction : No
LATEX PLUS

LATEX PLUS

Elasticising latex mixed with KERAQUICK S1. When KERAQUICK S1 is mixed...
New Construction : No
MAPEBAND

MAPEBAND

Alkali-resistant rubber tape with felt for cementitious waterproofing...
New Construction : No
MAPELASTIC AQUADEFENSE

MAPELASTIC AQUADEFENSE

Ready-to-use, ultra quick-drying, flexible liquid membrane for...
New Construction : No
PRIMER S

PRIMER S

Waterproofing primer in water dispersion. TECHNICAL DATA: Consistency:...
New Construction : No
TOPCEM

TOPCEM

Special normal-setting, quick-drying (4 days), controlled-shrinkage...
New Construction : No
ULTRACOLOR PLUS

ULTRACOLOR PLUS

High-performance, anti-efflorescence, quick-setting and drying...
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news