Interviewee
Adrian Tew Zeng Guang
LLT Specialists Sdn Bhd
Adrian Tew Zeng Guang shares his view about various aspects related to the application of MAPECOAT TNS acrylic colored coating proposed by Mapei in different projects, focusing on the challenges faced during works at the Sepang International Circuit.

Which kind of installation works do you usually carry out? Which environments are usually involved?

We mainly work on waterproofing and flooring applications over residential and industrial buildings. 

Which were the main challenges involved in the works at the Sepang International Circuit?

The main challenges were the limited time frame, as the project needed to be completed before the MotoGP event that only left us with a time frame of 10 days, and the exposure of the surfaces to weather agents that were beyond our control.  

In your opinion, what are the advantages of using MAPECOAT TNS acrylic coloured coating proposed by Mapei?

The main advantages were its easy application (even inexperienced workers for this product were able to apply it easily) and its fast-curing properties, which helped in this project especially due to the short time frame left for application operations. Malaysia hot weather had increased the curing time as well, which made this property much needed at that point of time. 
Besides the product is approved by FIA, the International Automobile Federation, that helped in the specification of the project: Last but not least, MAPECOAT TNS RACE TRACK was able to ensure high durability.

What are the strengths of the collaboration with Mapei?

Technical support from Mapei was very good: Mapei experts helped and assisted us to do a good job. They also helped us in getting the surface preparation done correctly especially as for repair and patching and this saved our time in managing the project. A team of technical people came from Mapei SpA (Italy) to ensure we did the right application: that showed much commitment from Mapei Group’s mother company, which we appreciated very much. The wide range of products provided by Mapei also helped to accommodate any gap that arose and solve the repair issues. Besides, we highly appreciated that the price position of Mapei quality products is at a reasonable range.

Project information

Petronas Sepang International Circuit, Sepang (Malaysia)
Design: Hermann Tilke
Period of construction: 1998
Period of the Mapei intervention: 2023
Intervention by Mapei: applying a protective colored coating on kerbs and runoff areas
Owner: Sepang International Circuit Sdn Bhd
Coating contractor: LLT Specialists
Mapei coordinators: Claire Wong Pek Yan, Lim Kean Meng and Lim Coco (Mapei Malaysia), Elisa Portigliatti and Marco Cattuzzo (Mapei SpA, Italy) 
Photos: Nicholas Yong & Farah Wahida
Interviewee
Adrian Tew Zeng Guang
LLT Specialists Sdn Bhd
Tag
#sport
Photo/Video Gallery
gallery
Product Lines
Products for sports flooring
You might also be interested in
Petronas Sepang International Race Circuit
Projects
4/2/2024
Petronas Sepang International Race Circuit
High level of effectiveness, durability and sustainability
Projects
4/4/2024
High level of effectiveness, durability and sustainability

In the article we mentioned: