| "Yard" | CAF subfloor |
|---|---|
| "Location" | Meinisberg, Switzerland |
| "Subcategory" | SCHOOL |
| "Application" |
In the extension building of the Meinisberg school, a new CAF subfloor was installed to create a stable and even foundation for the subsequent floor coverings.
The execution ensures high load-bearing capacity and a durable base that meets the demands of school operations. |
| "Start and finish date" | 2024 |
| "Application Type" | Flooring |
| "Installer companies" | Brodbeck AG, Biel |
| "Architects" | Skop AG, Zurich |
| "Project Manager" | Municipality of Meinisberg |
| "마페이 조정" | David Dellenbach |
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858