| "Yard" | safety tunnel, roadway, sidewalks |
|---|---|
| "Location" | Noiraigue, Switzerland |
| "Subcategory" | TUNNEL |
| "Application" |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| "Start and finish date" | 2024/2026 |
| "Application Type" | Waterproofing |
| "Installer companies" | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| "Architects" | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| "Project Manager" | Canton of Neuchâtel |
| "마페이 조정" | Alexandre Perona |