"Yard" | Terminal |
---|---|
"Location" | Abu Dhabi, United Arab Emirates |
"Subcategory" | AIRPORT |
"시공 시기" | 2012 |
"오픈 시기" | 2023 |
"Application" | Our contribution included advanced adhesives, sealants, repairs, and waterproofing systems, essential for ensuring the durability and integrity of various structural elements. |
"Start and finish date" | 2016/2023 |
"Application Type" | Sealants application, Waterproofing, New building, Cemetitious and resin floor coverings |
"Owner" | M/s Abu Dhabi Airports Co. (ADAC) |
"Contractor company" | M/s Trojan General Contracting M/s BIC Contracting LLC M/s TAV / CCC / ARABTEC JV |
"Installer companies" | M/s GCS GERMAN CONCRETE WORKS M/s ASP ACCESS FLOORS LLC M/s BOND INTERIOR DESIGN LLC M/s BOWYER WICK BUILDING M/s DEEMAH STONE M/s DEPA DEC.GEN.CONT.& MAIN.CO. L.L.C |
"Architects" | M/s BNP Paribas. M/s Kohn Pedersen Fox Associates (KPF). M/s Kellogg Brown & Root (KBR). M/s Turner & Townsend. (Cost Management) M/s Skidmore, Owings & Merrill (SOM). M/s E.Construct FZ LLC. |
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858