| "Yard" | The existing gallery was extended by 320 metres with the new building. |
|---|---|
| "Location" | Disentis, Switzerland |
| "Subcategory" | TUNNEL |
| "Application" | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
| "Start and finish date" | 2021 |
| "Application Type" | Roading |
| "Installer companies" | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
| "Project Manager" | Kanton Graubünden |
| "마페이 조정" | Marco Jungi |