"Yard" | living room, staircase, bathroom, terrace, outdoor seating area |
---|---|
"Location" | Balatonfüred, Hungary |
"Subcategory" | HOUSE |
"시공 시기" | 2025 |
"오픈 시기" | 2025 |
"Application" | During the project, alongside aesthetics, great emphasis was placed on durability and creative use of materials, for which Mapei provided solutions for the facade insulation, the tiling, and the indoor stair coating. |
"Start and finish date" | 2025 |
"Application Type" | Installation of floor and wall coverings, Underground constructions |
"Owner" | Tóth Enikő |
"Contractor company" | Tóth Enikő |
"Project Manager" | Holló László |
"MAPEI Distributor" | Mastino Depo Székesfehérvár |
"마페이 조정" | Doma András |
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858