"Yard" | New wood-look PVC flooring was laid on 664 m2. |
---|---|
"Location" | Villars-sur-Glâne, Switzerland |
"Subcategory" | CRECHE |
"Application" |
The floor of the Cap Canaille day care centre was renovated. The existing tiles were sanded down and spot filling was carried out with Planiprep Fast Track.
Then the very low-emission bonding primer Eco Prim Plus was applied and smoothed with Ultrabond Eco Xtra. Thanks to these substrate preparations, the new PVC flooring met the local standards. |
"Start and finish date" | 2021 |
"Application Type" | Installation of floor and wall coverings |
"Architects" | FACE à FACE à Genève |
"Project Manager" | Cap Canaille du groupe Babilou |
"마페이 조정" | Marcello Maieron |