| "Yard" | 80.000 square meters floors of carpark |
|---|---|
| "Location" | Пекін, China |
| "Subcategory" | PARKING |
| "시공 시기" | 2017 |
| "오픈 시기" | 2019 |
| "Application" | supplying products to lay cementitious floors in the carpark of the west wing |
| "Start and finish date" | 2019 |
| "Application Type" | Cemetitious and resin floor coverings |
| "Owner" | Shouzhong Investment Management Co. Ltd |
| "Contractor company" | China Construction Eighth Engineering Bureau |
| "Installer companies" | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
| "Project Manager" | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
| "마페이 조정" | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
"이 프로젝트와 관련된 모든 문서를 다운로드 할 수 있습니다"
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858