Forchbahn of the tunnel in Zumikon

Location icon Zumikon, Switzerland
"참조 #": 4640
"Category": TRANSPORTATION

"건축"

"Yard" From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
"Location" Zumikon, Switzerland
"Subcategory" TUNNEL
"Application" The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
"Start and finish date" 2022/2024
"Application Type" Roading
"Installer companies" Diamantbohr AG
"Project Manager" Forchbahn AG
"마페이 조정" Reto Stutz

"프로젝트에 사용 된 제품 "

ADESILEX PG2
ADESILEX PG2
Product not available for this market,
contact us
CARBOPLATE S
CARBOPLATE S
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news