| "Yard" | terminal and air traffic control tower |
|---|---|
| "Location" | Isztambul, Turkey |
| "Subcategory" | AIRPORT |
| "시공 시기" | 2016 |
| "오픈 시기" | 2028 |
| "Application" | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
| "Start and finish date" | 2016/2018 |
| "Application Type" | Anchoring, Installation of floor and wall coverings, Waterproofing |
| "Owner" | IGA-Istanbul Great Airport |
| "Contractor company" | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
| "Installer companies" | Umut Yalitim |
| "Architects" | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
| "MAPEI Distributor" | Umut, Himerpa, Pelenkoglu |
| Project Manager | Horizontal |
| "마페이 조정" | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |
"이 프로젝트와 관련된 모든 문서를 다운로드 할 수 있습니다"
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858