| "Yard" | Floor/wall coverings |
|---|---|
| "Location" | Taranto, Italy |
| "Subcategory" | HOSPITAL |
| "시공 시기" | 2004 |
| "오픈 시기" | 2005 |
| "Application" | Installation of granite and ceramic tiles |
| "Application Type" | Installation of floor and wall coverings |
| "Contractor company" | Convertini di Locorotondo (BA); Sipi Color (TA) |
| "Installer companies" | Ferrarese di Crispino (TA) |
| "Architects" | Arch. Patrizia Virginia Belli (BA) |
| "Credits" | Ing. Giammario Dispoto e Giuseppe La Neve (Coordinamento Tecnico) |
| Project Manager | Arch. Nicola Piccinno (TA) |
Mapei Korea
46, 5sandan 6-ro, Susin-myeon, Dongnam-gu, Cheonan-si, Chungcheongnam-do, Korea
- Fax +82 41 566 8858