"Yard" | The Sahligut learning swimming hall was completely renovated. The overall renovation included a new chrome steel swimming pool and a new glass façade, the complete replacement of the pool water technology and the redesign of the cloakroom area. |
---|---|
"Location" | Biel, Switzerland |
"Subcategory" | Aquatic Centre |
"Application" | The teaching pool at the Sahligut school was built between 1967 and 1968. After 50 years of operation, a comprehensive renovation was urgently needed. |
"Start and finish date" | 2021/2022 |
"Application Type" | Installation of floor and wall coverings |
"Architects" | Leimer Tschanz Architekten AG, Viaduktstr. 33, 2501 Biel Natalie Wyss Architektin |
"Project Manager" | Stadt Biel/Bienne Tobias Grimm Architekt und Projektleiter |
"마페이 조정" | Pirmin Nünlist |