PRIMER PU60

Moisture curing polyurethane resin for consolidating and waterproofing damp screeds.
TECHNICAL DATA:
Consistency: liquid.
Colour: brown.
Dilution ratio: from 25 to 100% with THINNER PU.
Set to light foot traffic: 3-8 hours according to dilution ratio.
Hardening time: 24 hours.
Waiting time before laying with reactive adhesive: 2-7 days.
Storage: 12 months.
Application: brush, roller or watering can.
Consumption: 0.4-1.2 kg/m².
Packaging: 10 kg drums.

Related documentation

Technical data sheet
Download

Last Projects PRIMER PU60

Category icon INFRASTRUCTURES

2014/2016

Port of Singapore (PSA)

Singapore

Concrete restoration

Category icon COMMERCIAL FACILITIES

2015/2016

Mapletree Business City 2

Singapore

Installation of floor and wall coverings

Category icon COMMERCIAL FACILITIES

Piraeus Bank

Serbia

Installation of floor and wall coverings

Category icon INFRASTRUCTURES

Port of Singapore Authority

Singapore

Concrete restoration

Keep in touch

Subscribe to our newsletter to get Mapei news