| Project | safety tunnel, roadway, sidewalks |
|---|---|
| Plaats | Noiraigue, switzerland |
| Omgeving | tunnel |
| Projectomschrijving |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Start- en einddatum | 2024/2026 |
| Toepassing | Waterproofings |
| Uitvoerder | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Architect | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Project Manager | Canton of Neuchâtel |
| Mapei coördinatie | Alexandre Perona |