| Project | pools and wet rooms |
|---|---|
| Plaats | Flitwick, Bedfordshire, Verenigd Koninkrijk |
| Omgeving | SPORTCENTRUM |
| Projectomschrijving | installation of ceramics and wet rooms |
| Start- en einddatum | 2016 |
| Toepassing | Vloeren/muren |
| Opdrachtgever | Stevenage Leisure Ltd. |
| Aannemer | Tiletec Group |
| Uitvoerder | Tiletec Group |
| Beschrijving | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |