| Project | terminal and air traffic control tower |
|---|---|
| Plaats | Isztambul, turkey |
| Omgeving | luchthaven |
| Ingebouwd | 2016 |
| Geopend in | 2028 |
| Projectomschrijving | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
| Start- en einddatum | 2016/2018 |
| Toepassing | Anchoring, Vloeren/muren, Waterproofings |
| Opdrachtgever | IGA-Istanbul Great Airport |
| Aannemer | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
| Uitvoerder | Umut Yalitim |
| Architect | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
| MAPEI distributeur | Umut, Himerpa, Pelenkoglu |
| Project Manager | Horizontal |
| Mapei coördinatie | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |