Chantier | 2015 FIFA Women’s World Cup soccer field (Olympic Stadium) |
---|---|
Localisation | Montreal, Canada |
Type de projet | STADE |
Construit en | 2015 |
Ouvert en | 2015 |
Intervention | 2015 FIFA Women’s World Cup soccer field (Olympic Stadium) |
Début et fin des travaux | 2015 |
Type d'intervention | Sols sportifs |
Titulaire Client | City of Montreal |
Maître d'ouvrage/entreprise générale | Carpell Surfaces Inc. |
Entreprise de construction/pose | Carpell Surfaces Inc. |
Distributeur MAPEI | Carpell Surfaces Inc. |
Photos | Carpell Surfaces Inc. |
Maître d'œuvre | Carpell Surfaces Inc. |
Conseiller technique MAPEI | Pierre Robitaille |
Description | MAPEI turf-installation products were used to lay down a temporary soccer field in Montreal’s Olympic Stadium, which was one of six Canadian sites for the 2015 FIFA Women’s World Cup. Ultrabond ® Turf PU 1K adhesive was used for a strong bond between the synthetic turf seams. |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.