Chantier | JW Marriott Miami |
---|---|
Localisation | Miami, États-Unis |
Type de projet | HÔTEL/AUBERGE |
Construit en | 2016 |
Ouvert en | 2017 |
Intervention | JW Marriott Miami |
Début et fin des travaux | 2016/2017 |
Type d'intervention | Finitions murales |
Titulaire Client | Marriott International, Inc. |
Maître d'ouvrage/entreprise générale | Diversified Construction and Engineering |
Entreprise de construction/pose | Diversified Construction and Engineering |
Distributeur MAPEI | National Waterproofing Supply |
Photos | Raul Ballester |
Maître d'œuvre | Emerson Barahona |
Conseiller technique MAPEI | Carlos Hernandez |
Description | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.