| Chantier | Parking garage, ceiling |
|---|---|
| Localisation | Gränichen, Suisse |
| Type de projet | PARKING |
| Intervention |
in order to restore its structural load-bearing capacity, an underground parking garage in Gränichen had to undergo extensive refurbishment after a car fire. A total of 2,000 m² of CFRP strips were bonded, with the longest strip measuring over 65 metres.
This measure ensures long-term stability and safety of the structure. |
| Début et fin des travaux | 2024 |
| Type d'intervention | Renforcement structural |
| Entreprise de construction/pose | Betosan AG, Aarau |
| Conseiller technique MAPEI | Erich Odermatt |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.