Chantier | the implementation of a set of measures for the repair and leveling of concrete surfaces, the strengthening of the tunnel arch, the production of concrete tubings |
---|---|
Localisation | Krasnodar, Russia |
Type de projet | AUTOROUTE |
Construit en | 2009 |
Ouvert en | 2013 |
Intervention | concrete repair, leveling of concrete surfaces, production of concrete tubings, strengthening of the tunnel arch |
Début et fin des travaux | 2010/2011 |
Type d'intervention | Préparation des supports, Restauration de maçonnerie, Nouveau bâtiment |
Titulaire Client | "Chernomorie" |
Maître d'ouvrage/entreprise générale | "Tunnelniy otryad 44" |
Architecte/planificateur | Sibgiprotransput - Roszheldorproekt branch |