| Chantier | 80.000 square meters floors of carpark |
|---|---|
| Localisation | Beijing, Chine |
| Type de projet | PARKING |
| Construit en | 2017 |
| Ouvert en | 2019 |
| Intervention | supplying products to lay cementitious floors in the carpark of the west wing |
| Début et fin des travaux | 2019 |
| Type d'intervention | Sols à base de ciment ou de résine |
| Titulaire Client | Shouzhong Investment Management Co. Ltd |
| Maître d'ouvrage/entreprise générale | China Construction Eighth Engineering Bureau |
| Entreprise de construction/pose | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
| Responsable de projet | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
| Conseiller technique MAPEI | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
Vous pouvez télécharger ici tous les documents associés à ce projet
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.