Chantier | Eastwood Towne Center Parking Garage |
---|---|
Localisation | Lansing, États-Unis |
Type de projet | PARKING |
Construit en | 2011 |
Ouvert en | 2012 |
Intervention | Eastwood Towne Center Parking Garage |
Type d'intervention | Nouveau bâtiment, Adjuvants béton |
Titulaire Client | City of Lansing |
Maître d'ouvrage/entreprise générale | Grand River Construction Inc. |
Entreprise de construction/pose | High Grade Materials |
Architecte/planificateur | Desman Associates |
Description |
Supplier: High Grade Materials Currently the city of Lansing, Michigan’s largest concrete building project. This is a $103 million class “A” leed?, cast-in-place, post-tension parking deck. The project required 10,000 cy of high strength, high performance concrete; including PT strengths of over 3,500 psi overnight in all conditions with ultimate strengths of 9,000 psi, architectural finished formwork, high strength columns and parking decks that can endure harsh winter conditions. |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.