Chantier | Wind Generation Electricity Projects |
---|---|
Localisation | Central Texas, États-Unis |
Type de projet | CENTRALE ELECTRIQUE |
Intervention | Wind Generation Electricity Projects |
Type d'intervention | Adjuvants béton, Nouveau bâtiment |
Titulaire Client | Florida Power and Light |
Maître d'ouvrage/entreprise générale | D.H. Blattner and Sons |
Description |
Ready Mix Supplier: Bauerly Brothers/Concrete Mobility Total Cubic Yards: 120,000 The concrete for the tower bases had a strength requirement of 5,000 to 6,000 psi in 28 days. High slump, high strength concrete was needed to place and consolidate the concrete with the large amount of steel reinforcement . The concrete also required extended slump life for the long haul to the project. The schedule dictated 1,500 – 2,000 cubic yards of concrete to be placed each day. This project was located in a remote region of central Texas which made delivery of materials a challenge. GRT dedicated two admixture trailers with full dispensing systems to service this project. |
Vous voulez être au courant des nouveautés chez Mapei ?
Alors inscrivez-vous tout simplement à notre newsletter ou à notre magazine Realtà Mapei.