Chantier | 6.5 Km Twin Tunnel. |
---|---|
Localisation | Gangangir, Srinagar, INDE |
Type de projet | MÉTRO |
Construit en | 2018 |
Ouvert en | 2018 |
Intervention | a small 500 sqm waterproofing job was awarded for above portal application of PVC Membrane. Entire tunnel waterproofing to begin end of this year (2018). Shotcrete has been entirely catered by MAPEI Admixture, accelerators and Polypropylene Fibres. |
Type d'intervention | Adjuvants, Travaux souterrains, Imperméabilisation |
Maître d'ouvrage/entreprise générale | Il&Fs / Apco Infratech – Titan Jv |
Distributeur MAPEI | Mapei India Ltd |
Photos | Sambhav Chawla |
Maître d'œuvre | Mr. Shista Prasad |