The best support for every type of floor

These floors are surfaces exposed to intense traffic and constant use such as in hospitals, schools, airports, offices, shops and industrial environments. Various factors have to be carefully analysed (moisture content, the flatness and evenness of the substrate, etc.) to guarantee durability and maximum performance. 

This line of products includes adhesives, smoothing and levelling compounds and primers for installing resilient and acrylic and polyurethane resin flooring.

13.Innovazione

INNOVATION

All our products are tested in special environmental simulation chambers.

23.Sostenibilita

ECO-SUSTAINABILITY

We have been awarded certification from various international programmes for safeguarding the environment and health.

14.Internazionalita

INTERNATIONALITY

The range is comprehensive in order to cater for different requirements all around the world.

technical-documentation-wTechnical documentation

News & Events

Mapei sets the scene at Gatwick Airport Station

February 12, 2024

Mapei renovation and tiling systems have been used as part of an extensive redevelopment at Gatwick Airport Station.  The project, which was carried out by DMC Contracts for Costain, included construction of a new second concourse and airport entrance, doubling available space for passengers accessing the airport terminal.

Before the pandemic, more than 21 million journeys were made through Gatwick Airport Station every year, and those passenger figures are rapidly recovering.  Providing a ‘bigger, better and brighter’ space, the new concourse is the size of eight tennis courts and has created 500m2 of extra space in the existing station concourse. The upgraded station is fully accessible to all passengers and includes eight new escalators, five new lifts, new stairways and widened platforms, as well as new information areas, wide ticket gates and a dedicated passenger assistance point.

During DMC Contracts’ surface preparation, cracks in the existing concrete screed were first repaired with Mapei Eporip solvent-free epoxy adhesive. Mapeproof One Coat surface damp proof membrane was then applied, to suppress residual and construction moisture, followed by Mapei ECO Prim T Plus – a very low VOC universal acrylic primer. The surface was levelled with fibre-reinforced levelling and smooth compound, Mapei Ultraplan Renovation Screed 3240 

Prior to tiling, Mapetex system anti-fracture membrane was bonded to the substrate with Mapei Ultralite Rapid Flex S1 adhesive – a rapid-setting, low dust flexible, lightweight one-component adhesive.  

During the final fix, Mapei adhesives were used to install the 600 x 600mm porcelain tiles: Mapei Keraquick S1 quick-setting and Mapei Keraflex Maxi S1 deformable cementitious adhesive.  The tiles were then grouted with Ultracolor Plus - Mapei’s anti-efflorescence and mould-resistant quick-setting and drying polymer-modified grout and all perimeters, intermediate and construction joints were filled with Mapesil AC mould-resistant pure silicone sealant. 


If you would like to be kept up to date with all the developments and industry news from Mapei UK.
Click here to sign up -  https://www.mapei.com/gb/en/newsletter 

surface preparation epoxy adhesive membrane primer levelling compound smoothing compoud

Products mentioned in the article

EPORIP
EPORIP
Two-component solvent-free epoxy adhesive, for repairing cracks in screeds. Suitable as a primer for tiling metal surfaces. Where to use:…
MAPEPROOF ONE COAT
MAPEPROOF ONE COAT
The product is easy to use and dries within 6 hours in the following temperatures: +10°c 5-6 hours +23°c 3-4 hours +30°c 2-3 hours
ECO PRIM T PLUS
ECO PRIM T PLUS
Universal acrylic primer for all absorbent and non-absorbent substrates
KERAQUICK S1
KERAQUICK S1
High-performance, quick-setting, deformable cementitious adhesive with no vertical slip for ceramic tiles and stone material stable in the…
KERAFLEX MAXI S1
KERAFLEX MAXI S1
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: 30 minutes. Waiting time before grouting: – on walls: 4-8 hours; – on…
MAPESIL AC
MAPESIL AC
Pure, mould-resistant, acetic silicone sealant with BioBlock ® technology for movements up to 25%.

Solutions

Projects

Category icon RESIDENTIAL BUILDINGS

Islington Wharf

Manchester, United Kingdom

Installation of floors

Category icon PUBLIC BUILDINGS AND PLACES

Westin London City

London, United Kingdom

Installation of floors

Category icon SPORT FACILITIES

Sandwell Aquatic Centre

Smethwick, United Kingdom

Waterproofing systems

Category icon PUBLIC BUILDINGS AND PLACES

Sunningdale SEN School

Sunderland, United Kingdom

Installation of floors

Realtà Mapei articles

Do you need assistance?

Keep in touch

Subscribe to our newsletter to get Mapei news