Rothorn Sörenberg

Location icon Sörenberg, Svájc
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Referenciaszám: 4658
Kategória: Út/utca/autópálya

Építés

Felhasználási terület ceiling of the passage tunnel
Hely Sörenberg, Svájc
Alkategória Alagút
Alkalmazás At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Kezdési és záró dátum 2023
Alkalmazás típusa Mélyépítés
Beépítést végző cég Gasser Felstechnik AG, Lungern
Projektvezető Rothornbahn Sörenberg
Kreditek Ramon Lehmann Fotografie
MAPEI Koordinálás Urs Wirth

A projektben használt termék

LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Maradjon kapcsolatban velünk

Iratkozzon fel hírlevelünkre, így nem marad le a Mapei friss híreiről