MAPEFLOOR FINISH 53 W/L

MAPEFLOOR FINISH 53 W/L

Two-component, aliphatic, transparent, shiny polyurethane finish in water dispersion with no NMP for protecting resin systems.
TECHNICAL DATA:
Mixing ratio: comp. A : comp. B = 10 : 1.
Colour of mix: transparent.
Consistency of mix: fluid.
Workability time: 15-20 minutes at +23°C.
Varnishing: from 3 to 5 hours.
Sanding: after 12 hours.
Set to the touch: 40 minutes.
Dust dry at +23°C and 50% R.H.: 40 minutes.
Set to light foot traffic at +23°C and 50% R.H.: 6-7 hours.
Final hardening time: 12 hours at +23°C.
Gloss: 80.
Taber Test (after 7 days, CS17 disk, 1000 cycles, 1000 g): 22 mg.
Storage: 12 months in its original sealed packaging.
Application: short-haired roller such as mohair or airless spray system.
Consumption: 0.1-0.2 kg/m² according to the grade of finish required for the coating material.
Packaging: 2 kits (A+B) of 5 + 0.5 l units.

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download

Last Projects MAPEFLOOR FINISH 53 W/L

Keep in touch

Subscribe to our newsletter to get Mapei news