| Yard | Tunnel path |
|---|---|
| Location | Flurlingen, Switzerland |
| Subcategory | TUNNEL |
| Application |
In ridge grouting, cement is injected in combination with the plasticizer Dynamon Injekt to ensure optimal workability and penetration of the gap.
This creates a secure bond between the shotcrete and the surrounding rock, sustainably increasing the stability and load-bearing capacity of the structure. |
| Start and finish date | 2024 |
| Application Type | Supplying of admixtures |
| Installer companies | Implenia Tunneling Schweiz, Glattpark (Opfikon) |
| Specialists involved | ASTRA, Winterthur |
| MAPEI Coordination | Urs Wirth |