Yard | car park flooring |
---|---|
Location | Dubai, United Arab Emirates |
Subcategory | PARKING |
Built in | 2024 |
Opened in | 2024 |
Application | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
Start and finish date | 2024 |
Application Type | Installation of floors |
Client | ARCO Turnkey Solutions Llc |
Installer companies | Gecko Middleeast Technical Services Llc |
Architects | Young Engineering Llc |
MAPEI Coordination | Ashok |