| Yard | CAF subfloor |
|---|---|
| Location | Meinisberg, Switzerland |
| Subcategory | SCHOOL |
| Application |
In the extension building of the Meinisberg school, a new CAF subfloor was installed to create a stable and even foundation for the subsequent floor coverings.
The execution ensures high load-bearing capacity and a durable base that meets the demands of school operations. |
| Start and finish date | 2024 |
| Application Type | Installation of floors |
| Installer companies | Brodbeck AG, Biel |
| Architects | Skop AG, Zurich |
| Specialists involved | Municipality of Meinisberg |
| MAPEI Coordination | David Dellenbach |