 Sepang, Malaysia
                                
                                    Sepang, Malaysia
                                
                             
                            | Yard | Kuala Lumpur International Airport 2 (KLIA2) | 
|---|---|
| Location | Sepang, Malaysia | 
| Subcategory | AIRPORT | 
| Built in | 2013 | 
| Opened in | 2013 | 
| Application | Kuala Lumpur International Airport 2 (KLIA2) | 
| Start and finish date | 2013 | 
| Application Type | Floor/wall covering | 
| Client | Malaysia Airports Holding Berhad | 
| Contractor company | WCT Construction S/B & UEMC-Bina Puri | 
| Installer companies | Hon & Cheah Construction & Tiling Sdn Bhd / Sun-Trident Sdn Bhd | 
| Architects | Arkitek AAP | 
| MAPEI Distributor | Mapei Malaysia Sdn Bhd | 
| Other | MAPEI tiling installation in Kuala Lumpur International Airport 2 (KLIA2) Integrated Complex. Integrated complex comprises the transportation hub, Express Rail Link terminal, shopping mall, boarding and departure lounges and linkway passages. The Client wanted a top-of-the-range tile adhesive that is able to withstand the stresses of heavy traffic of people, trolleys and electric carts. | 
 
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                 
                                