| Yard | Epoxy flooring system, Tile adhesive and Grout, Floor Screed |
|---|---|
| Location | Dubai, United Arab Emirates |
| Subcategory | MUSEUM |
| Built in | 2022 |
| Opened in | 2022 |
| Application |
Interior and Exterior works
3D Wall brick application in the Reception Area and Tiling work - Bathroom and Common Areas. |
| Start and finish date | 2019/2021 |
| Application Type | |
| Contractor company | BAM INTERNATIONAL |
| Installer companies | DEEMAH STONE |
| Architects | AECOM AND KILLA DESIGN |