PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Related documentation

Technical data sheet
Download

Last Projects PRIMER SN

Category icon PUBLIC BUILDINGS/PLACES

2020

Quarantine Centre at Junior Police Call Permanent Activity Centre

Pat Heung, Hong Kong

Waterproofing

Category icon PRODUCTION FACILITIES

2019

Re-roofing work at Lee Kum Kee Factory

Tai Po, Hong Kong

Installation of floors, Waterproofing

Category icon COMMERCIAL

2019

Star Properties office

Kwun Tong, Hong Kong

Installation of floors

Category icon RESIDENTIAL

2019/2020

Re-roofing work Hong Tat Court and Hong Chi Court

North Point, Hong Kong

Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news