| Art der Baustelle | safety tunnel, roadway, sidewalks |
|---|---|
| Standort | Noiraigue, Schweiz |
| Unterkategorie | TUNNEL |
| Anwendung |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Anfangs- und Abschlussdatum | 2024/2026 |
| Art der Anwendung | ABDICHTUNGEN |
| Installationsunternehmen | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Architekten | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Projektmanager | Canton of Neuchâtel |
| Koordinierung von MAPEI | Alexandre Perona |