| Art der Baustelle | pools and wet rooms |
|---|---|
| Standort | Flitwick, Bedfordshire, Großbritannien |
| Unterkategorie | SPORTZENTRUM |
| Anwendung | installation of ceramics and wet rooms |
| Anfangs- und Abschlussdatum | 2016 |
| Art der Anwendung | Boden- und Wandbeläge |
| Eigentümer | Stevenage Leisure Ltd. |
| Bauunternehmen | Tiletec Group |
| Installationsunternehmen | Tiletec Group |
| Beschreibung | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |