Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malaysia
Ref.-Nr.: 60000032
Kategorie: INFRASTRUKTUR/TRANSPORT

Bauwesen

Art der Baustelle Klang Valley Mass Rapid Transit (KVMRT)
Standort Malaysia
Unterkategorie METRO
Gebaut 2013
Eröffnet 2014
Anwendung Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Anfangs- und Abschlussdatum 2013/2014
Art der Anwendung ABDICHTUNGEN
Eigentümer Mass Rapid Transit Corporation Sdn Bhd
Bauunternehmen MMC Gamuda KVMRT (T) Sdn Bhd
Installationsunternehmen CRT Specialist (M) Sdn Bhd
Architekten Mott MacDonald (M) Sdn Bhd (Engineers)
Händler von MAPEI Mapei Malaysia Sdn Bhd
Beschreibung The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m
from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform.
The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform.
The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Im Projekt verwendetes Produkt

PRIMER SN
PRIMER SN
Zweikomponentige, gefüllte Epoxidharzgrundierung zur Verbesserung des…
334 - BIBLOCK
BIBLOCK
Product not available for this market,
contact us
434 - IDROSTOP SW
IDROSTOP SW
Product not available for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not available for this market,
contact us
2299 - MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Product not available for this market,
contact us
2126 - PURTOP 1000
PURTOP 1000
Product not available for this market,
contact us

Bleiben Sie in Kontakt

Melden Sie sich für unseren Newsletter an, um stets über Neuigkeiten von Mapei informiert zu werden