System for the Fast Track Installation of Sheet Vinyl, LVT and Rubber Flooring on Concrete with High Moisture - R18

Commercial building
Internal flooring; Gymnasium
Installation of resilient flooring; Installation of LVT

Products

1
Properly prepared concrete substrate
4
Levelling Compound
6
Resilient Floor Covering

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news