System for the Installation of Engineered Timber Flooring over a Difficult Substrate - T05

Commercial building
Internal flooring
Installation of wooden flooring

 

Application steps

1
Concrete Substrate
2
Bonding primer
3
Fibre-reinforced levelling compound
4
Timber flooring adhesive
5
Engineered Timber Planks

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news