Pátio | JW Marriott Miami |
---|---|
Local | Miami, USA |
Subcategoria | HOTEL |
Construído em | 2016 |
Aberto em | 2017 |
Aplicação | JW Marriott Miami |
Datas inicial e final | 2016/2017 |
Tipo de aplicação | Acabamentos |
Proprietário | Marriott International, Inc. |
Empresa empreiteira | Diversified Construction and Engineering |
Empresas instaladoras | Diversified Construction and Engineering |
Distribuidor da MAPEI | National Waterproofing Supply |
Créditos | Raul Ballester |
Project Manager | Emerson Barahona |
Coordenação da MAPEI | Carlos Hernandez |
Descrição | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |